Saturday, January 23, 2016

Production Subcontracting in AX7

Microsoft Dynamics AX uses the following terms in the implementation of discrete subcontracting manufacturing.

Subcontracting: The process of either outsourcing a specific resource or the capability to optionally outsource based on business logic of capacity planning. 

Bill of Materials (BOM): A list of items or sub-assemblies that contains the number of items used per finished assembly. It is also a representative hierarchy of how products are assembled based on level. A BOM needs to be active before it can be used in Production control. Only one BOM can be applied to any assembly, although multiple versions can be kept.

BOM Line Type:
  • Item – a raw material or semi-finished good that needs to be picked from inventory.
  • Phantom – a product that is a transient (non-stocked) BOM.
  • Pegged Supply – used when the production order is estimated based on the default order and parameter settings.
  • Vendor – The line type for the Bill of Materials to signal to AX that the item or bill of materials is supplied by a subcontractor 
Resources: A resource can be a machine, tool, vendor, human resource, or a location. 

Routes and Operations: A route determines the sequence of events to build the finished product.

Production Order: An order that initiates and sequentially moves the production process from creation to when the product is ready for shipment.

Please click here or below link watch the video for Production Subcontracting in Dynamics AX7


No comments:

Post a Comment

Create checks that have Blank status for D365FO

  Introduction Microsoft released a new Feature in version 10.0.3 of  Dynamics 365 for Finance and Operations related to Checks in Blank ...